Charge the furnace with Raw Material and start firing. |
|
| |
| Check the Molten Bath for Contamination |
|
| |
| Check for Ag, Bi and other impurities in lead bath which must be below customer requirement. |
|
| |
 |
Take out proportional Quantity of molten lead out of pot and add other material containing low content of impurities. |
|
| |
| Check for Sb, Sn, As, Cu , Cd and other impurity. |
|
| |
 |
| Take out proportional Quantity of molten lead out of pot and add other material containing low content of impurities |
|
| |
 |
1. De-Cu, De-Cd
2. Removal of Black Dross |
|
| |
1. Quality Control (Sample Test on Spectrometer)
2. Maintain the Composition of Bath As per Customer |
|
| |
Add calculated Quantity of Sb or its master alloy keeping Stirrer in rotation and keeping the Temperature constant. |
|
| |
Take Sample after adding 75% of each Master / Pure Alloy. Calculate the Remaining as per analysis report and add balance quantity in one or two stages. |
|
| |
Add calculated Quantity of Sn or its master alloy keeping Stirrer in rotation and keeping the Temperature constant. |
|
| |
| Take Sample after adding 75% of each Master / Pure Alloy. Calculate the Remaining as per analysis report and add balance quantity in one or two stages. |
|
| |
Add calculated Quantity of As or its master alloy keeping Stirrer in rotation and keeping the Temperature constant. |
|
| |
Take Sample after adding 75% of each Master / Pure Alloy. Calculate the Remaining as per analysis report and add balance quantity in one or two stages. |
|
| |
After setting of all elements within Spec. except Se, add Se Master Alloy or its Pure Form very cautiously & gradually keeping stirrer in rotation. |
|
| |
1. Stir the bath to ensure well homogeneous mixture of lead bath.
2. Skim off the Dross. |
|
| |
1. Take Sample of Se Master / Pure Alloy.
2. Calculate the Remaining Quantity of Se Alloy as per analysis report and add balance quantity in one or two stages. |
|
| |
1. Quality Control (Final Sample Test on Spectrometer).
2. Maintain the Composition of Bath As per Customer Specification. |
|
| |
1. Ingot Casting
2. Regular Sample Checking. |
|
| |
| Take Sample after every 200 ingots including first and last. |
|
| |
| Take final analysis report from Quality Analysis Lab. Containing No. of Ingots, Lot no., Name of Customer & Product. |
|
| |
1. Packaging/Stacking/Color Coding
2. Warehousing |
|
| |
|
| Top |